Chapter 7

P-Cubed

Prepare, Prove, Produce. The cycle for executing an Epic.

On this page

Prepare → Prove → Produce


The Problem P-Cubed Solves

You've got an Epic. It's too big to just start coding. But you can't plan forever either. You need a way to move from "I've been handed this objective" to "I shipped it."

Most failures happen because people skip phases:

  • Skip Prepare: Build the wrong thing. Discover problems mid-flight.
  • Skip Prove: Commit to architecture that doesn't work. Expensive rework.
  • Skip Produce: Plan forever. Never ship.

P-Cubed is the cycle that prevents these failures.


The Framework

Phase Purpose Exit Criteria
Prepare Understand the problem space, surface tradeoffs, define tasks Can explain it, tradeoffs documented, tasks scoped to 1-2 days
Prove Validate load-bearing decisions before committing Architectural assumptions tested, approach survives scrutiny
Produce Build, test, ship Criteria met, shipped

Each phase has a purpose. Each phase has exit criteria. Move through them in order.


Phase 1: Prepare

Purpose: Build understanding. Surface tradeoffs. Plan the work.

Prepare has three parts: Discovery, Tradeoffs, and Planning.

Discovery

You don't fully understand the terrain yet. That's expected. Discovery is the work.

What to do:

  • Ask questions. You're not supposed to have all the answers yet.
  • Explore the system. Read the code. See how it behaves.
  • Write down your unknowns. Track open questions explicitly.
  • Talk to people who have context. They know things you don't.
  • Map the landscape. What exists? What's missing? What's broken?

Communicate your status. Tell stakeholders: "I'm in discovery on this. I'll have questions. Once I understand it, I'll come back with a plan."

This sets expectations. No one should expect a timeline yet. No one should expect you to be building yet. You're learning.

Discovery isn't delay; it's investment. Every hour in discovery saves multiple hours of building the wrong thing.

Exit when:

  • You can explain the problem space clearly to someone else
  • You're not getting surprised anymore
  • Your open questions are resolved or explicitly deferred

Surface Tradeoffs

For each significant decision, articulate the tradeoffs.

Ask:

  • What are our options?
  • What does each option optimize for?
  • What does each option make harder?
  • What are we giving up with each choice?
  • What's the cost to change this later?

There's no "right answer." There's no "best practice." There's only: "What are we giving up, and can we live with it?"

Document the tradeoffs. Not for bureaucracy, for clarity. When someone asks "why did you do it this way?" the answer is in the document.

Planning

Break the Epic into Tasks.

For each Task:

  • Write: "This is done when ___." One sentence. Specific.
  • Scope to 1-2 days of focused work. If bigger, break it down.
  • Identify what it depends on.
  • Identify what depends on it.

Sequence matters:

  • Architectural tasks first. They're load-bearing.
  • Design tasks after. They can flex.
  • Dependencies explicit. No hidden blockers.

A good plan:

  • Can be explained to someone else
  • Has clear acceptance criteria for each Task
  • Surfaces the risky parts early
  • Is small enough to adjust when you learn things

Phase 2: Prove

Purpose: Validate load-bearing decisions before you commit.

Prove is where you test your assumptions. Not all of them; just the ones that matter.

When Prove is Required

Required for architecture:

  • Data model decisions
  • Service boundaries
  • Third-party integrations
  • Core abstractions others will depend on
  • Anything expensive to change later

Optional for design:

  • API shape (can be refactored)
  • UI details (can be iterated)
  • Implementation details within a boundary
  • Anything cheap to change later

If you're not sure, ask: "What's the cost if this is wrong?" High cost = prove it first.

The Spike

A spike is a focused experiment to validate an assumption.[1]

What makes a good spike:

  • Specific question to answer
  • Timeboxed (hours, not days)
  • Throwaway code (don't ship it)
  • Clear success/failure criteria

Example spikes:

  • "Can we get sub-100ms response times with this approach?"
  • "Does the third-party API actually support this workflow?"
  • "Will this data model handle the edge cases?"

The spike answers the question. Then you decide. Then you move on.

Prove Checklist

  • [ ] Walk through the task sequence. What could go wrong?
  • [ ] Identify the riskiest assumptions
  • [ ] Spike the ones that could sink the project
  • [ ] Validate tradeoff assumptions in practice
  • [ ] Refine the plan based on what you learned
  • [ ] Get alignment on the approach

Exit when:

  • High-risk assumptions are tested
  • The task sequence is solid
  • You're ready to commit to this approach

Phase 3: Produce

Purpose: Execute the tasks. Ship the Epic.

You've done the preparation. You've validated the risks. Now build.

The Rhythm

Sequence matters. Architectural tasks first. Design tasks after. This isn't arbitrary; it's risk management. Get the load-bearing stuff right before you build on top of it.

For each Task:

  1. Confirm criteria. Before you start, confirm what done looks like. Don't assume.

  2. Build. Do the work. Trust your prep. Stay focused on the scoped definition, not the thing you just thought of that would be cool.

  3. Test. Verify against acceptance criteria, not intuition. The criteria are the criteria.

  4. Ship. Complete the task. Mark it done. Communicate. Move to the next.

Learning Loop

After each Task:

  • What did you learn?
  • Does it change the remaining tasks?
  • Did you discover a new task that needs adding?
  • Is the Epic still on track?

Adjust the plan if needed. The plan is a tool, not a prison. When reality diverges from the plan, update the plan.

When Things Go Wrong

They will. Here's what to do:

Blocked by something unexpected:

  • Document what's blocking you
  • Can you work on something else in parallel?
  • What would unblock it? Who can help?

Task is bigger than expected:

  • Stop. Don't just keep going.
  • Break it into smaller pieces
  • Replan. Communicate the change.

Approach isn't working:

  • Did you skip Prove?
  • Is this a sunk cost situation? Don't throw good hours after bad.
  • What's the minimum change to get back on track?

Scope is creeping:

  • Write down the new scope as a separate Task or Epic
  • Finish the current Task as originally scoped
  • Then decide whether to add the new work

The Mantra

Define done before you start. Check criteria, not feelings. Ship when done means done.

This is the heartbeat of P-Cubed. Every phase. Every task. Every decision.


Common Failure Modes

The Forever Prepare: Discovery that never ends. Always one more question. Always more to understand. The cure: timebox it. Set a deadline. Ship what you know.

The Skipped Prove: Jumping from Prepare straight to Produce. "We don't have time to spike it." Then spending twice the time fixing what the spike would have caught. The cure: prove the risky stuff. It's faster.

The Gold-Plated Produce: Tasks that expand. "While I'm in here..." The cure: finish the task as scoped. Write down the new idea. Finish the current thing. Then decide.

The Feelings Check: "Does this feel done?" Wrong question. "Does this meet the criteria?" Right question. The cure: write down the criteria before you start.


P-Cubed in Practice

Day 1: Start Prepare. Discovery. Ask questions. Explore.

Day 2-3: Continue Prepare. Surface tradeoffs. Draft the task list.

Day 3-4: Prove. Spike the risky parts. Validate assumptions.

Day 4 onwards: Produce. Execute tasks. Ship. Learn. Adjust.

The exact timing varies by Epic. Some need more Prepare. Some need more Prove. But the sequence is always: Prepare → Prove → Produce.


The Exit Criteria Summary

Phase You're done when...
Prepare You can explain it clearly, tradeoffs are documented, tasks are 1-2 days each
Prove Risky assumptions are validated, approach survives scrutiny, ready to commit
Produce All tasks ship, acceptance criteria met, Epic is done

Prepare to understand. Prove to validate. Produce to ship. This is the cycle.